Olomoana access road
Pago Pago, AMERICAN SAMOA — Department of Public Works construction of the Olomoana access road was dedicated on Tuesday, Sept. 24.
The project included paving an access road to repair an existing two-lane asphalt road that was 20 feet wide, with a total length of seven thousand six hundred twenty...

![The proposed project included paving an access road to repair an existing two-lane asphalt road that was 20 feet wide, with a total length of 7,620 feet. [courtesy photo] repair of an existing two-lane asphalt road](https://www.samoanews.com/sites/default/files/styles/teaser/public/field/image/olomoana_access_rd_dedication.jpg?itok=ZxRZe_ay)